Preparation of all conditions, measures and activities that prevent or mitigate environmental pollution preserves and maintains natural balance, sustainable use of natural and created value through the development of studies and studies in accordance with the requirements of the legislation of the Republic of Srpska, Bosnia and Herzegovina, as well as with the application of all European Directives the Union in the field of environmental protection, with an emphasis on finding a solution between the ever-present conflict between the consumption of existing natural resources and the requirements for economic development on the one hand and the need to preserve human health and the environment on the other side.


We produce the following study documentation:

  • Preliminary assessment of the impact on the environment
  • Study on Environmental Impact Assessment
  • Evidence (with the application for issuing an environmental permit)
  • Waste management plan for collection, transport and disposal of waste.

Conservation and improvement of the environment is constantly present and is an integral part of all our projects from the planning stage to the implementation. The result is the creation of the concept of environmental management as a science and management skills through the control of environmental risk (in the planning, design and establishment of an environmental management system) as the dominant factor of business risk.

strateska procjena UP Vlasenica slika projekta

Report on the Strategic Environmental Impact Assessment of the Urban Plan on the area of Municipality of Vlasenica 2016 - 2036

Location: Municipality of the Vlasenica
Investor: Municipality of the Vlasenica
The year of the manufacture: 2016/2017

Strateska procjena autoput Banja Luka - Doboj slika

Report on the Strategic Environmental Impact Assessment of the Parcel plan for the highway Banja Luka - Doboj

Location: Banja Luka/Laktaši
Investor: JP Highways RS
The year of manufacture: 2016

Kedrova suma projekt slika

Study of the preservation and improvement of the Kedar Forest in the framework of the Tolga Monastery

Location: Russian Federation, Yaroslavl territory
Investor: NPP KADASTAR Yaroslavl, Russian Federation
The year of manufacture: 2016

Studije modernizacije pruge, procjena utcaja zivotnu sredinu Slika projekta

Preliminary studies and preliminary design of the reconstruction and modernization of the Doboj-Tuzla-Brcko railroad, Preliminary Environmental Impact Assessment

Location: Doboj Tuzla Brčko
Investor: Delegation of the European Union to Bosnia and Herzegovina
The year of manufacture: 2015/2016

HES Gornja Neretva slika projekta

Environmental Impact Assessment Study of the HES "Upper Neretva" Project - Phase II

Location: Municipality of the Kalinovik
Investor: „MARVEL“ d.o.o. Kalinovik
The year of manufacture: 2015/2016

Gornja neretva slika projekta

Environmental Impact Assessment Study of the HES "Upper Neretva" Project - Phase I

Location: Doboj Tuzla Brčko
Investor: Investor: Delegation of the European Union to Bosnia and Herzegovina
The year of manufacture: 2012/2014

Ekos Gradiska

Strengthening the elements of protection and improvement of the environment of the integral ecological center Ekos Gradiška

Location: Gradiška
Investor: Fund for Environmental Protection and Energy Efficiency RS Banja Luka
The year of manufacture: 2012/2013

HE Mrsovo slika

Environmental Impact Study HE "Mrsovo"

Location: Mrsovo, Rudo
Investor: „COMSAR ENERGY HIDRO“ d.o.o. Banja Luka
The year of manufacture: 2011/2012

slika termoelektrana ugljevik

Environmental impact study for new thermal power plants Ugljevik 3

Location: Ugljevik
Investor: „COMSAR ENERGY REPUBLIKA SRPSKA“ d.o.o. Banja Luka
The year of manufacture: 2012/2013

Slika Brezovica ski centar

Environmental Impact Assessment Ski Center Brezovica

Location: Brezovica, Kosovo, Serbia
Investor: Ecosing Europa Mountain Recreation Planers GMBH
The year of manufacture: 2011/2011

Slika termoeletrana Ugljevik

Study on measuring the total noise level for the Thermal Power Plant Ugljevik 3

Location: Municipality of the Ugljevik
Investor: “Comsar Energy Trading” d.o.o Banja Luka
The year of manufacture: 2013.

Slika autoputa

Report on the revision of the Environmental Impact Study of the Highway on Corridor Vc, LOT1 Svilaj - Vukosavlje

Location: Svilaj - Vukosavlje
JP Highways RS, Banja Luka
The year of manufacture: 2014.

Slika termoeletrana Ugljevik

Evidence with the application for the issuing of an environmental permit for the highway E661 Gradiška - Banja Luka, the way Mahovljani - Glamočani

Location: Banja Luka/Laktaši
Investor: JP Highways RS
The year of manufacture: 2012.

Slika autoputa

Study of the impact of the Hydroelectric power plants Dabar project on the environment

Location: Eastern Hercegovina
Investor: „Hydroelectric power plants DABAR“ d.o.o. Trebinje
The year of manufacture: 2011/2012

Slika termoeletrana Ugljevik

Evidence with the request for the issuance of an environmental permit for a football field project within the sports and recreational center in Banja Luka

Location: Banja Luka
Investor: Football Federation of Republika Srpska
The year of manufacture: 2013.

Slika autoputa

Study on the impact of the "Ulog" hydroelectric power plant on the environment

Location: Kalinovik
Investor: „EFT" HE Ulog d.o.o. Kalinovik
The year of manufacture: 2009/2011